Font Size 
A
A

St Leonards South Draft Master Plan

Consultation is now closed.

Consultation ran from 19 December 2014 to 1 May 2015.

Contact Details

Chris Pelcz - Strategic Planner
Ph: (02) 9911 3516
Email

Background

Council resolved to undertake a master planning process for the precinct in St Leonards bounded by the Pacific Highway to the north, the railway line to the east, River Road to the south and Greenwich Road to the west. Council officers developed a Brief for the St Leonards Strategy, to be undertaken in two parts.

Consultants David Lock and Associates (DLA) were engaged to complete Stage 1 of the St Leonards Strategy. The Precinct Report includes:-

  • Consideration of the current State, metropolitan and local strategic planning context;
  • A summary of existing conditions such as land use, demographic profile, urban structure and built form, public domain and natural features, vehicular and pedestrian access and movement, and physical infrastructure;
  • A summary of the community consultation undertaken as part of Stage 1; and
  • An analysis of issues and opportunities for the precinct.
St Leonards Master Plan.png

Preliminary community consultation was undertaken and the community feedback received is summarised in the Stage 1 Consultation Report.

Stage 2 of the St Leonards Strategy will allow Council to develop a long term strategic approach to development, close to the major transport hub of St Leonards.

In response to technical and community feedback received through a series of community sessions and workshops, a Draft Master Plan has been prepared by urban planning consultants and endorsed by Council on 8 December 2014 for public exhibition.

Overview

Council is seeking the community's views on the Draft St Leonards South Master Plan study which discusses potential changes to the zoning and scale of areas in the precinct bounded by the rail line, Berry Road, Pacific Highway and River Road, St Leonards as well as the provision of community facilities, open space and other matters.

The purpose of the draft Master Plan is to discuss:-

  • Density Potential
  • Financial Viability
  • Sustainable Urban Design & Amenity
  • Infrastructure
  • Staging and Transition Management

Community Consultation Session

A community consultation session will be held on Tuesday the 21st of April from 6:15pm to 8:30pm in the Cove Room, Ground Floor, Lane Cove Civic Centre (48 Longueville Road, Lane Cove). To RSVP please call 02 9911 3627.

Related Documents

What's Next?

Stage 3 of the St Leonards South Master Plan is now underway following the adoption of the Draft Master Plan at a Council Meeting on 13 July.

An updated report was considered by Council at the Ordinary Council Meeting of 15 February 2016 where council resolved received and noted the report.

For the latest information view Council's Hot Topics section.